Repainting to begin this week

There's an update from management about the repainting of the reddish paint. It only went to owners so renters may not be aware of the scheduled repainting. The e-mail reads: "Dear Owners: DW Johnston will be starting tomorrow, Tuesday, Sept 14th at 8:00 a.m. The power wash equipment is gasoline powered so the noise will start at 8 am and run throughout the day. They are starting with unit #65 (3521 Melody Lane) and will proceed down the west side of Melody finishing with Unit #79 (3661 Melody Lane) before moving to unit #82 (210 Enterprise Way) and the east side of Melody Lane. Once the power wash is complete and windows cleaned, the stucco has to dry for a few days before painting begins." Thank you to the resident who forwarded the e-mail to Positively Palermo and also posted it. We're posting it again in case you missed it. Miss Penny Lane says: She, too, requires a touch up every now and then because this desert air can be a drag on her porcelain complexion.

9/14 UPDATE: Here is the latest e-mail from management: "DWJ will be done with the power washing on Melody Lane later today. They will then move to Sandy Point Trail then Breeze Loop. All of this should be done by Friday, Sept 17th. Due to potential winds they will stop cleaning so as not to get too far ahead of the painters. The exterior stucco needs to dry for a couple of days then be checked by the paint manufacturer before applying the primer. DWJ plans to start the prime coat the first of next week for the units on Melody Lane."

9 comments:

Anonymous said...

Thanks, I rent and don't see this stuff.

TundraTabby said...
This comment has been removed by the author.
TundraTabby said...

Maybe I'll be lucky and get my windows washed out of this deal! (Sorry about my earlier deletion - I can't spell anymore these days!)

Anonymous said...

Thanks for this, too. As a renter I rely on this site for info.

Anonymous said...

Also, cute kittie above.

TundraTabby said...

Here is the next update email owners received from DRM:

DWJ will be done with the power washing on Melody Lane later today. They will then move to Sandy Point Trail then Breeze Loop. All of this should be done by Friday, Sept 17th. Due to potential winds they will stop cleaning so as not to get too far ahead of the painters.

The exterior stucco needs to dry for a couple of days then be checked by the paint manufacturer before applying the primer.

DWJ plans to start the prime coat the first of next week for the units on Melody Lane.

Anonymous said...

What happened? No painting started this week, did it? Only the power washing occurred.

Anonymous said...

No painting happened - did it? The back "lot" also wasn't sprayed green. Delays I guess.

TundraTabby said...

Here is a recent update from a DRM email:

The power washing to a point was completed on Wed, Sept 15. The painters will start on Monday, Sept 20, 2010.